What can I do at Live Management View: Quality Assurance?
With Live Management View: Quality Assurance you gain insight into all quality recordings performed within your projects. View answers from quality checks, open recording points, statistics and reports in one central place. Within Quality Assurance you work with three sections: - Overall view - Recordings - Recording points
Written By Sven van der Kemp
Summary
The overview shows, for each construction number, which responses have been provided within a quality library (checklist).
Select one or more projects and click ‘Search’. If necessary, use the ‘Library’ filter to display only a specific checklist.

The columns are organized by quality library, and each row represents a construction number within the project.

Meaning of the columns
Total number of questions answered
Shows how many responses were provided within the construction number.
1st signature
The date on which the first signature was added.
Not checked off / still pending
The number of inspection points that are still open.
Responses
Here you can see which answers were given and how often they occur.
Click on a row to view all answers for the construction number.
Inspections
Under the ‘Inspections’ tab, you can see all quality inspections that have been started within a project.
Select one or more projects and click ‘Search’. Then click on an inspection to view all inspection points for that inspection.
Tip: Users with the ‘Administrator’ role can delete surveys and individual survey points from this overview.

Meaning of the columns
Recording
The letter Q stands for quality recording. The number following it is the report number.
Examples:
Q1 = first quality recording
Q2 = second quality inspection
Report title
The name of the report as entered when starting the inspection in the STA app.
Library
The checklist used during the inspection.
Construction numbers
The selected construction numbers from the survey.
Number of recording points
The total number of responses and survey points within the survey.
Started on
The date the recording started.
Started by
The user who created the recording.
1st signature
The date on which the first signature was added.
2nd signature
The date on which the second signature was added.
Not checked off / still pending
The number of outstanding items.
Responses
Shows which answers were given and how often they occur.
Calendar days until second signature
Shows how many days there are between the first and second signatures.
You can set the maximum timeframe via ‘Settings’. If the deadline is exceeded, a yellow warning appears.
Download
Download the quality report as a PDF.
Inspection points
The ‘Inspection Points’ tab shows an overview of all quality inspection points added via the STA app.
Using this overview, you can, among other things:
edit recording points;
export photos;
create Excel exports;
generate PDF reports;
view graphs and statistics;
Filter recording points
Use the filters at the top of the page to search for specific recording points.
Useful examples:
View recording points for a specific action holder via “Action”
View only open items via ‘Closed and Open Items’
Filter by a specific library rule via ‘Library’
You can combine multiple filters.
Click ‘Clear Filters’ to start over.
Results: List
In the list view, you’ll see all check-in points listed one below the other.

Meaning of the columns
Photo
View the photos of the recording point here.
Blue dot = number of photos added
Yellow dot = recovery photo added
No photos added? Then you’ll see “No image.”
Project
The project number of the project.
Construction number
The associated construction number.
Code
The unique code of the measurement point.
Example:
Q2-1 = first measurement point from quality report Q2
Description
Shows:
the question;
any comments;
the status;
the user who added the recording point.
Location
The room in which the recording point was detected.
Action
The person responsible for resolving the issue.
Statuses:
Green checkmark = reported as complete
Yellow checkmark = in progress
Date
The date the recording point was added.
Deadline
The date by which the item must be completed.
If the deadline is exceeded, this will be marked.
File
Shows files that have been added to the recording point.
Response
The response provided, including any urgency.
Checkmarks
Shows how far the ticket has been processed.
Three green checkmarks mean fully completed.
Calendar days until fully completed
Shows how many days were needed to fully resolve the incident.
Export photos
Click on ‘Export photos’ to download all photos from the overview.
Do you want to export only a selection? Then first select the desired recording points.
Export to Excel
Click on ‘Export to Excel’ to export all survey points without photos to Excel.
Here, too, you can make a selection first.
Create PDF report
Click on ‘Create PDF report’ to combine inspection points into a single report.
This is useful, for example, for sharing all open items for an action holder.
Results: Drawing
Select ‘Drawing’ at the top to view inspection points directly on the construction drawing.
Here you can:
open inspection points via the markings;
see which points have been fixed;
check off survey points directly.
A thick first checkmark means the point has been marked as complete.
Results: Graph
Select ‘Graph’ at the top to view trends and statistics.
Here you can see, among other things:
most common answers;
number of checkpoints;
trends within projects;
performance of action owners.
These insights help improve quality processes within your company.